Westside Connection Construction Management Services
This was an extremely high-profile project for the local area, with very high liquidated damage premiums which made on time completion essential. M&S provided construction management and construction inspection services and was responsible for inspection of the tunnel for structural concrete. While the scope of work changed several times due to unforeseen conditions, the deadline for the project remained the same.
Location
New York City, NY
Owner
Amtrak
Services Provided
Construction Management/Construction Inspection
M&S Scope Items Included:
Replacing 2,496 direct fixation fasteners
Repairing defective concrete plinth pads
Replacing 80,000 linear feet of CWR
Replacing 15,000 cross ties
Replacing two No. 20 turnouts
Replacing three grade crossings
Distributing required ballast
Surfacing all ballasted track
Rehabilitating and lowering approximately 645 feet of track structure between the tunnel portal and 157/159 double slip in A-Interlocking.