This project involved the modernization of the vehicle maintenance and storage garage at the existing facility to meet the current and future needs of the Commission, and to provide various maintenance and safety upgrades to the toll plaza and Welcome Center. This work included a 13,000 square foot addition to the maintenance facility building, incorporation of a salt conveyor system, a brine tank farm and spraying area, construction of a new fuel island canopy, upgrading an existing I-78 access driveway, and construction of a canopy between the Welcome Center and the toll booth canopy.
Location
Northhampton County, PA
Owner
DRJTBC
Services Provided
Site/Civil Engineering, Water Resources, Survey
Malick & Scherer, P.C. was responsible for all Site/Civil design.
These Tasks Included:
Site Grading
Utility coordination
Drainage improvements and modifications
Associated site/civil engineering design for proposed retaining walls